Phase 2 membrane project, Day 107–November 28, 2026

Phase 2 Membrane Replacement Project

Project Mobilization Date: July 20, 2026
Work Start Date: May 4, 2026 (for emergency repairs)
Expected completion: December 2026
Primary contractor: Prostar
Engineering design: Strata Engineering

Weather: 8–10°C, mostly sunny
Workers onsite: At least 6

Work done today:

  • Continuing work to reinstate the first planter by the Building 240 entrance
  • Further work on placement of concrete bricks in the same area
  • Reinstatement of more pavers near to the entrance of Building 244
  • Work to address an open drain that was pouring water into the underground paring lot