The two signs that had gone crooked in separate incidents along the left side of the entrance to Copperstone have been straightened and secured by the Council President.
Before:

After:

The two signs that had gone crooked in separate incidents along the left side of the entrance to Copperstone have been straightened and secured by the Council President.
Before:

After:
