Phase 2 membrane project, Day 2–July 21, 2026

Phase 2 Membrane Replacement Project

Project Mobilization Date: July 20, 2026
Work Start Date: May 4, 2026 (for emergency repairs)
Expected completion: December 2026
Primary contractor: Prostar
Engineering design: Strata Engineering

Weather: 33°C, sunny
Workers onsite: At least four

Work done today:

  • Additional work on the Building 244 patios facing the visitor parking
  • A section of pavers was removed from the parking lot in front of the patios
  • Plywood planking was removed from the temporary ramp that had been installed at the Building 244 entrance