Weather: 32°C, sunny
Workers onsite: At least 4
Work done today:
- River stone/gravel was added to some of the emergency repair area.
- Additional pavers/pedestals were placed on some patios.
- Pavers were extended in the Phase 1 extension area in a way that doesn’t match the previous design–see photos below.