Membrane work, June 11, 2026

Weather: 21°C, mostly sunny
Workers onsite: At least 4-6

Work done today:

  • Irrigation piping in the Phase 1 extension area installed by Blue Drop.
  • Continued work on membrane in the emergency repair area, with most upturns and the main area completed.

Leave a Comment