Weather: 27°C, mostly sunny
Workers onsite: 7
Work done today:
- Fencing added to protect patio near existing protective barrier for trees
- Fencing added around the C can
- Safety sign erected on east side of driveway entrance
- Further clearing of the Phase 1 area in front of the 244 building, including stripping and removal of membrane