Weather: 20°C, mostly cloudy
Workers onsite: Two observed
Work done today:
- Additional installation of metal flashing was done on the 240 and 244 buildings and patios in the emergency repair area
- General cleaning of the emergency repair area was done
Weather: 20°C, mostly cloudy
Workers onsite: Two observed
Work done today: