Membrane work, June 25, 2026

Weather: 20°C, cloudy
Workers onsite: At least 2

Work done today:

  • Soil placed in the Phase 1 extension, adjacent to the wooden beams, with additional soil placed into the planter adjacent to the 244 building.
  • Bridge placed in emergency repair area, possibly to allow foot traffic through as remainder of the area is worked on.
  • Flashing is being cut and put back into the base of the 244 building in the emergency repair area.