Membrane work, June 23, 2026

Weather: 32°C, sunny
Workers onsite: 2

Work done today:

  • Additional pavers for the sidewalk added to the emergency repair area.
  • Some metal flashing (trim) has been restored to some patios.
  • Patio railings were re-instated (see photos and notes on this below).

Leave a Comment