Emergency membrane repair (pre-Phase 2 work), Day 3

Weather: 18°C, cloudy
Workers onsite: At least 4

Work done today:

  • The protective barriers are complete. The one surrounding the main heritage trees has a pair of gates to allow access to the other side of the Heritage Courtyard.
  • The concrete slab between the 240 and 244 buildings has been power-washed. Replacement membrane and other materials are expected onsite tomorrow.
  • Hoarding (temporary fencing) is now in place around the southeast corner of the visitor parking, meaning there is no vehicle or pedestrian access. A few of the central parking stalls are also now reserved for Prostar personnel.