Phase 1 Membrane Replacement Project
Project Mobilization Date: August 11, 2025
Work Start Date: August 28, 2025
Expected duration: 2–3 months (Completion now likely in February 2026)
Primary contractor: Prostar https://prostar.ca/
Weather: Clear, 9C
Work done today:
- Membrane applied to the concrete slab behind the 244 building.
- Membrane applied to the lower area of the concrete slab between the 244 and 248 buildings, adjacent to the parking lot.
- Work to prepare for membrane to be extended up the base of the 244 and 248 buildings and pillars. This consisted of placing protective board, then affixing them in place with industrial nails/washers.
- Workers onsite: At least 4.