Weather: 16°, cloudy, some showers
Workers onsite: At least four
Work done today:
- Additional work on applying sealant and membrane to some patios.
- Membrane applied to the majority of emergency repair area.
- Delivery of aeration mat, stacks in both emergency repair and Phase 1 areas.
- Repair of sidewalk adjacent to emergency repair area. When the repairs have cured, this sidewalk will be treated with the same coating used on crosswalks to provide a seal.

