Membrane work, June 5, 2026

Weather: 16°C, cloudy, some showers
Workers onsite: At least four

Work done today:

  • Additional work on applying sealant and membrane to some patios.
  • Membrane applied to the majority of emergency repair area.
  • Delivery of aeration mat, stacks in both emergency repair and Phase 1 areas.
  • Repair of sidewalk adjacent to emergency repair area. When the repairs have cured, this sidewalk will be treated with the same coating used on crosswalks to provide a seal.