Light bollard re-installed at entrance of 240 building

When he wasn’t hosing down the stairs, Jeff took time over the Thanksgiving weekend to re-install the light bollard that had been missing from in front of the 240 building (Jeff is a certified electrician, so he is qualified to do the work). The bollard was recovered after getting knocked over in the past year.

Here it is, lighting the way again:

Leave a Comment