Not because we went around inside it spraying Febreze, but the vents that allow air in and out have been hosed down, allowing air to flow more freely. For good measure, the floor was hosed down, too.
Signs have been placed on the three dumpsters in the 244 garbage room, reminding the garbage removal company to fold the lids back when returning them to the garbage room. We’ll continue to monitor and follow up with the company if needed to make sure the bins remain easily accessible.